Installation and Commissioning of Nitrogen Plant at Site of NESR Chad- Central Africa - Central Africa
Universal Boschi set up 500 litre/hr liquid nitrogen (LIN) plant for a reputed company known as NESR in Chad, a north-central African country. The LIN plant was installed in compliance with standard Universal Boschi protocol involving inspection of the site, local power supply and environmental conditions. Installation and configuration of the plant machinery is executed to ensure optimal use of land use allowing for organisation of the site for internationally approved standards of safety and environmental protection. The LIN plant is manufactured with the top-notch cryogenic air separation technology thus is also able to generate liquid oxygen as well. Nitrogen generated has purity of 99.999% which is considered the best for any industrial application.